3StocksOnFire — US Stock Trading Community · 451+ trades · 257% returns · 15,000 members · Main Site · Trader's Guide · Articles · Video Analyses
3 Stocks On Fire
3StocksOnFire Community Forum
Home Message Boards Trader's Guide Articles Video Analysis About Us Search Register

UCOI.OB

Started by 52 windsor deluxe, September 21, 2006, 11:20:54 AM

Previous topic - Next topic

evgeny05

Hi
:o

evgeny05

Unico, Inc. Announces New Metallurgist for Mill and Processing Facility at the Deer Trail Mine

Thursday , January 25, 2007 09:10ET


SAN DIEGO, CA -- (MARKET WIRE) -- 01/25/07 -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today announced that its wholly owned subsidiary, Deer Trail Mining Company, LLC, has contracted with Rob Robson, a metallurgist with over 20 years experience in metallurgical work in the mining industry. The focus of Mr. Robson's work will be on the optimization of the design and flow of the floatation circuit for the mill and production facility at the Deer Trail Mine.


Mr. Robson most recently served as mill superintendent at an operating mine in Canada. He previously worked for United Glencairn Resources, producing an operating manual for gold processing operations, and for North American Metals Corporation at the Golden Bear Mine in Northern British Columbia, serving in various positions of increasing responsibility and culminating as process superintendent.

Mr. Robson functioned as laboratory manager for Kazakhstan Goldfields in Kazakhstan. He set up and operated testing and assaying laboratories for Ash & Associates Consulting Ltd. on several projects in Canada. Mr. Robson also served as process superintendent for Candorado Mines Ltd. of Hedley, British Colombia, a producing gold operation.

After receiving his diploma as a Mining Technologist from British Columbia Institute of Technology in 1981, Mr. Robson was awarded a diploma in Gas & Oil Technology from the British Columbia Institute of Technology.

"We are extremely pleased to have retained a quality consulting metallurgist with the experience and expertise of Mr. Robson as we move through the completion phase and the start-up of operations at the Deer Trail mill and processing facility," said Mark A. Lopez, chief executive officer of Unico, Inc. "Mr. Robson is already on site at the Deer Trail property, and we look forward to his contributions toward maximizing the potential of this facility."

Shareholders who would like to sign up to receive information by email directly from Unico, Inc., particularly when new press releases, SEC filings or other information is disclosed, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php.

About Unico, Inc.

Unico, Inc. (OTCBB: UCOI), is a publicly traded natural resource company in the precious metals mining sector that is focused on the exploration, development and production of gold, silver, lead, zinc, and copper concentrates at its three mine properties: the Deer Trail Mine, the Bromide Basin Mine and the Silver Bell Mine. The company has recently announced agreements to acquire over 70 additional mining claims. For more information, please visit www.unicomining.com.

Forward-Looking Statements



evgeny05

Hi
8)

evgeny05

Hi
0.015 :o

evgeny05

 :o 8)

evgeny05

Unico, Inc. Announces Continued Progress on Completion Phase of Reconstruction of Mill and Processing Facility at the Deer Trail Mine

Tuesday , January 30, 2007 08:50ET


SAN DIEGO, CA -- (MARKET WIRE) -- 01/30/07 -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today announced continued progress toward completion of the mill and processing facility at the Deer Trail Mine in Marysvale, Utah, including the installation of additional equipment for the facility. Photographs of the progress are expected to be posted to the company's website, www.unicomining.com, in the next several days.


The recently purchased WesTech 40-foot thickener, which will be primarily used to thicken tailings, has been delivered and is being prepared for installation. The cement foundation for the thickener has been poured.

The footings to support the Emico filter have been completed, and the legs that support the filter base have been fabricated. The filter base has been placed on its foundation. National Filter Media of Salt Lake City, Utah has supplied the Deer Trail Mining Company with samples of their filter media for the company's metallurgist to determine the best filter cloth for its application.

Installation of the constant density tank for feeding the hydrocyclone used in the classification of ores has been completed, and the company has installed the primary conditioning tanks used to treat the ores before going to floatation. A secondary conditioner tank has been installed that will be used to separate the zinc from the gold, silver and lead concentrate. The steel for the upper mezzanine above the thickener tank has been ordered and is scheduled for delivery this week. Much of the floor area of the new mill building was tamped and lined with bentonite, and the cement foundation has been poured.

"There has been a great deal of progress on the installation of equipment at the mill and processing facility at the Deer Trail Mine over the last several weeks, and we are pleased to report these advances to our shareholders," said Mark A. Lopez, chief executive officer of Unico, Inc. "Each step in the reconstruction program brings us that much closer to finishing the remaining work on the facility so that processing operations can begin at the mill."

Shareholders who would like to sign up to receive information by email directly from Unico, Inc., particularly when new press releases, SEC filings or other information is disclosed, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php.



evgeny05

 8) :o

evgeny05

Unico, Inc. Announces New Photo Gallery Showing Progress of Reconstruction of the Mill and Processing Facility at the Deer Trail Mine

Thursday , February 01, 2007 09:13ET


SAN DIEGO, CA -- (MARKET WIRE) -- 02/01/07 -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today announced that it has added a new photo gallery to its website showing recent reconstruction of the mill and processing facility at the Deer Trail Mine in Marysvale, Utah. The photographs include newly installed equipment, as well as preparation of the flooring, foundations and footings for the equipment.


The new reconstruction photo gallery has been added to the "Media" section of the Unico website at http://www.unicomining.com./news/othermedia.php.

The photographs show numerous pieces of equipment that have been installed in the main mill building. Included in the pictures is the installed constant density tank for feeding the hydrocyclone, which will be used to classify ores. Also pictured are the primary conditioning tanks used to treat the ores before going to floatation. In addition, the gallery shows the secondary conditioner tank, which will be used to separate the zinc from the gold, silver and lead concentrate.

There are several pictures of continued progress in the new mill building, including the pouring of the cement flooring and assembly of the footings for the WesTech 40-foot thickener, which will be primarily used to thicken tailings. Photographs show the preparation to the floor area of the new mill building when it was tamped and lined with bentonite, and as the cement foundation was poured. Also for the new building, the gallery shows the company unloading steel for the mezzanine, which will be built above the thickener.

"We are pleased to show our recent progress on the installation of equipment at the mill and processing facility at the Deer Trail Mine with this new photo gallery," said Mark A. Lopez, chief executive officer of Unico, Inc. "There were significant strides made over the last several weeks, particularly in the delivery and placement of equipment, and we hope that through the addition of these photographs, our shareholders will gain a better understanding of how the reconstruction is progressing through the completion phase and how the overall project is coming together out at the Deer Trail."

Shareholders who would like to sign up to receive information by email directly from Unico, Inc., particularly when new press releases, SEC filings or other information is disclosed, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php.

About Unico, Inc.



evgeny05

 :o 8)

evgeny05

Hi
:o 8)

evgeny05

 8) :o

evgeny05

Hi

UCOI - Hold (Only my opinion)   :o 8)

evgeny05

Unico, Inc. Releases February 2007 Edition of Investor Newsletter

Thursday , February 08, 2007 11:02ET



SAN DIEGO, CA -- (MARKET WIRE) -- 02/08/07 -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today released the February 2007 edition of its investor newsletter, which reviews the major events of the previous month. The February edition focuses on progress of reconstruction of the mill and processing facility at the Deer Trail Mine in Marysvale, Utah, particularly the purchase, delivery and installation of key equipment for the facility.

A PDF version of the newsletter has been added to the company's website at http://www.unicomining.com./news/newsletters.php, and an email notification of the newsletter's release has been sent to subscribers to the Unico electronic mailing list.

In addition to updates on the new equipment at the Deer Trail Mine facility, the January newsletter issue includes articles on financing that the company has recently received, progress on procurement, design and engineering for the new electrical substation at the Deer Trail Mine, the addition of a new metallurgist who is working to optimize operations at the mill facility, the 2007 exploration plan for the Clyde and Crown Point mining claims, and the very first "Investor Q&A" feature. The Investor Q&A deals with the question of expected capacity at the mill and processing facility at the Deer Trail Mine.

"January was a busy month for Unico, which saw a great deal of progress toward the completion of the mill and processing facility at the Deer Trail Mine," said Mr. Lopez. "We are pleased to present this edition of our newsletter to shareholders, and we hope that they find it to be informative."

The Investor Q & A feature in Unico's monthly newsletters provides an opportunity for shareholders to submit questions by email or telephone and one or two selected questions will be answered in each future edition. By providing this forum, Unico management hopes to address inquiries that are of interest to a broad segment of the company's shareholder community. Questions can be submitted by email to [email protected] or by telephone to 951-587-8072 . The first Investor Q & A feature will appear in the February 2007 newsletter.

Shareholders who would like to sign up to receive information by email directly from Unico, Inc., particularly when new press releases, monthly newsletters, SEC filings or other information is disclosed, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php.


sir_joke

current trading range.... IMHO

.011   get in at anything below this price  trade carefully above this price.

.019  get put fast, it will drop back....

my favorite trades...

.012 buy
.016 sell
and on volume of 2 to 3 million shares.

cheers,
SJ

evgeny05

#29
 8) :o
Unico, Inc. Announces Additional Progress Update in Completion Phase of Reconstruction of the Mill and Processing Facility at the Deer Trail Mine

Friday , February 16, 2007 09:05ET



SAN DIEGO, CA -- (MARKET WIRE) -- 02/16/07 -- Unico, Incorporated (OTCBB: UCOI), a natural resource company in the precious metals mining sector, today announced additional developments in the reconstruction of the mill and processing facility at the Deer Trail Mine in Marysvale, Utah. Progress includes work in the main mill building, in the new building that will house the filtration and thickener, and on the new electrical substation that will provide power to the mill and additional activities at the mine.

Several large steel tanks have been purchased from Questar Gas, the local natural gas provider, and installed in the new mill building. These tanks can be used in the floatation circuit to re-circulate water from the tailings. Construction of the thickener in the new building is ongoing and the lighting has been ordered with delivery expected next week.

In the main mill building, safety guards that cover the main drive pulleys and ring gear have been fabricated and installed, all in accordance with MSHA (Mine Safety and Health Administration) requirements.

BNA consulting is finalizing the blueprints for the new substation and construction is expected to begin shortly. With the completed blueprints, the ground will be prepared and leveled and a concrete foundation will be poured for the main transformer, which is now ready for delivery to the site.

"We have been extremely fortunate and have experienced good weather conditions this winter at the Deer Trail Mine," said Mark A. Lopez, chief executive officer of Unico, Inc. "Since the beginning of the year, there has been consistent progress on the reconstruction of the mill and processing facility, and the recent work in both the main mill building and the new building have taken us further through the completion phase of this project.

"As we continue to complete our work in those buildings, we will also focus considerable attention on the construction of the new substation, which will provide power to our reconstructed mill and help it to run in a more cost-effective manner. We are pleased with this progress and look forward to reporting additional milestones in the next several weeks," added Mr. Lopez.

Shareholders who would like to sign up to receive information by email directly from Unico, Inc., particularly when new press releases, SEC filings or other information is disclosed, are asked to visit the company's website at http://www.unicomining.com/IR/mailinglist.php.